{"id":2009,"date":"2020-11-05T18:12:00","date_gmt":"2020-11-05T17:12:00","guid":{"rendered":"https:\/\/www.4pl-intermodal.com\/?p=2009"},"modified":"2021-11-10T16:25:55","modified_gmt":"2021-11-10T15:25:55","slug":"digital-trade-venture-estonia-and-latvia","status":"publish","type":"post","link":"https:\/\/www.4pl-intermodal.com\/en\/digital-trade-venture-estonia-and-latvia\/","title":{"rendered":"Digital Trade Venture Estonia and Latvia"},"content":{"rendered":"\n<p>In cooperation with the <a href=\"http:\/\/www.bmwi.de\" target=\"_blank\" rel=\"noopener\">BMWI<\/a>, 4PL intermodal and 7 other companies are interested in cooperation and business expansion in the Baltic States of Estonia and Latvia. Experts from ports and logistics in the Baltic States were &#8220;met&#8221; via video conferences on the topic of sustainable mobility and logistics as well as port expansion.<\/p>\n\n<p><a href=\"http:\/\/www.railbaltica.org\" target=\"_blank\" rel=\"noopener\">Rail Baltica<\/a> is a greenfield railway infrastructure project with the aim of integrating the Baltic States into the European railway network. The project covers five European Union countries &#8211; Poland, Lithuania, Latvia, Estonia and indirectly Finland. It will connect Helsinki, Tallinn, P\u00e4rnu, Riga, Paneve\u017eys, Kaunas, Vilnius and Warsaw. The Baltic part of the Rail Baltica project is called the global Rail Baltica project.<\/p>\n\n<p>4PL Intermodal offers with its software solution<strong> IMSLOT<\/strong> and its<strong> Modules<\/strong> the possibility to improve the knowledge about reliable intermodal connections from\/to\/via Central Europe and the Baltic States.<\/p>\n\n<p>Therefore, we took the opportunity to get in touch with the intermodal actors of the region for the first time. Supported, arranged and hosted by <strong>AHP International <\/strong>we successfully introduced ourselves to more than 50 companies in groupings and bilateral meetings.<\/p>\n\n<p>Organised by the <strong><a href=\"http:\/\/www.ahp-international.de\" target=\"_blank\" rel=\"noopener\">AHP<\/a> International <\/strong>and supported by the <strong><a href=\"http:\/\/www.bmwi.de\" target=\"_blank\" rel=\"noopener\">FEDERAL MINISTRY OF ECONOMICS AND ENERGY<\/a><\/strong> from Germany, the <strong><a href=\"http:\/\/www.bafa.de\" target=\"_blank\" rel=\"noopener\">Mittelstand Global <\/a><\/strong>Bafa initiative and <strong><a href=\"https:\/\/gatewaypartners.net\/\" target=\"_blank\" rel=\"noopener\">Gateway Partners<\/a><\/strong> we were warmly welcomed as delegates. We were provided with first-hand information and insights about the economy in question.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Rail Baltica.&#8221; Here, the largest ports in Estonia and Latvia are also connected to the standardized European rail network. <\/p>\n","protected":false},"author":2,"featured_media":2027,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[4],"site-category":[71],"class_list":["post-2009","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-4pl-intermodal-gmbh-en","site-category-4pl-intermodal"],"taxonomy_info":{"category":[{"value":4,"label":"4PL Intermodal GmbH"}],"site-category":[{"value":71,"label":"4PL Intermodal"}]},"featured_image_src_large":["https:\/\/www.4pl-intermodal.com\/wp-content\/uploads\/2020\/11\/2020-11-14-18_14_04-Estland-Lettland-3-1024x499.png",1024,499,true],"author_info":{"display_name":"Nils Olaf Klabunde","author_link":"https:\/\/www.4pl-intermodal.com\/en\/author\/klabunde\/"},"comment_info":0,"category_info":[{"term_id":4,"name":"4PL Intermodal GmbH","slug":"4pl-intermodal-gmbh-en","term_group":0,"term_taxonomy_id":4,"taxonomy":"category","description":"","parent":0,"count":33,"filter":"raw","cat_ID":4,"category_count":33,"category_description":"","cat_name":"4PL Intermodal GmbH","category_nicename":"4pl-intermodal-gmbh-en","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/posts\/2009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/comments?post=2009"}],"version-history":[{"count":7,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/posts\/2009\/revisions"}],"predecessor-version":[{"id":5546,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/posts\/2009\/revisions\/5546"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/media\/2027"}],"wp:attachment":[{"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/media?parent=2009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/categories?post=2009"},{"taxonomy":"site-category","embeddable":true,"href":"https:\/\/www.4pl-intermodal.com\/en\/wp-json\/wp\/v2\/site-category?post=2009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}